© bloom bagebi 2024.
05. Handover Conditions

"Bloom Bagebi" is delivered with improved green frame condition

  • Completed construction and installation works
  • Vertical water and sewage risers
  • Natural gas, electricity and ventilation shaft vertical risers
  • Completed and finished balcony
  • German-made iron entrance door to the apartment
  • Smart home lock installed on the iron door
  • Aluminum windows and doors on the apartment perimeter
  • Leveled floor
  • Utilities connected to the apartment - electricity, gas line, water line
  • Underfloor heating pipes network
  • Ceramic granite tiles laid on the balcony